The engineering and design department of LUKAS-KRAN will fulfill your order for the development of a Crane Production Design ( PPRK) for safe installation work, as well as, in some cases when loading or unloading machinery, equipment using crane technology.

According to FNP PPR PS - a project for the production of works using lifting structures. The term PS - lifting structures , includes all types of cranes and lifts, including auto-hydraulic lifts for lifting people to work at height.

 

Development of PPRK

 

Services for the development of projects for the production of work are carried out in accordance with the legal regulation and certificates confirming certification for industrial safety and giving the right to develop projects for the production of work with cranes or hoisting machines.

Without appropriate design documentation, the work of a crane or hoisting machine, hoisting structure, cannot be carried out. In some cases, it is required to have flow charts for loading and unloading operations.
Regulatory acts and documents in the field of industrial safety on the rules for working at hazardous production facilities where lifting structures are used unambiguously read:

p. 98. Execution of construction and installation works, loading and unloading works on existing communications, roadways or in cramped conditions at HIFs using PS should be carried out in accordance with the PPR developed by the operating or specialized organization, in accordance with with the requirements of paragraphs 159-167 of these FNP. ( Order of the Federal Service for Environmental Technical Supervision dated 26.11.2020, number 461)

For the literacy and quality of drafting the production of works, all responsibility lies with the developers . Carrying out work in violation or deviation from the PPR standards is strictly prohibited. Any changes or additions can only be made by the PPR developer.

After drawing up the PPR of the PS the project must be provided by the construction company at least 5 working days prior to the completion of the work.

Order of the Federal Service for Environmental, Technological and Nuclear Supervision of May 10, 2007 No. 317 "On the approval and implementation of guidelines on the procedure for developing projects for the production of work by lifting machines and technological maps of loading and unloading operations":

p. 1.2. Installation of hoisting machines, organization and execution of construction and assembly work with their use are carried out in accordance with a specially developed project for the production of hoisting cranes (PPRK).

Loading and unloading operations and storage of goods by cranes and cranes-manipulators at bases, warehouses, sites are performed according to the technological maps of loading and unloading operations.

 

Compilation and development of PPRK.

Many years of experience and a high level of professionalism help LUKAS-CRANE developers to prepare projects and flow charts for loading and unloading operations, in accordance with the requirements of the current regulatory documents (FNP dated November 26, 2020 No. #461).

PPRK project The right to produce the corresponding projects for the production of works by cranes, confirmed by the certification of Rostechnadzor. The staff of LLC LUKAS-KRAN employs only experienced engineers and technicians who have undergone special training in the field of industrial safety of hazardous production facilities, in accordance with the procedure established by the Federal Service for Environmental, Technological and Nuclear Supervision.

After agreement with the operating organization, truck cranes or hoisting machines, the head of the construction company performing the work, finally approves the developed PPRK. Both the design engineer and the head of the operating organization of lifting equipment, who gives their signature for the approval of the PPRK, must have the appropriate permit, undergo training and pass certification in the field of industrial safety of hazardous production facilities, in accordance with the standards and relevant rules.

Developers of the LUKAS-KRAN engineering and design department will prepare the following types of projects for you:

  • Project for the production of tower cranes.
  • Project for work with crawler, self-propelled, truck cranes.
  • Project of work with cranes-manipulators.
  • Project for the installation and operation of construction hoists (front, mast).
  • Project for the production of works for the installation and operation of portable and hinged platforms.
  • Project for the production of works for the installation of a tower crane.
  • Project for the production of works using auto-hydraulic lifts (aerial platforms) for lifting workers, installers in cradles.

 

DO I NEED AN EXPERTISE / APPROVAL OF Rostechnadzor PROJECTS FOR PRODUCING CRANE WORK (PPRK)?

Important! The order of March 5, 2013 CANCELED the need to carry out an examination of Work Projects by cranes, as well as to register in the territorial circles of Rostechnadzor.

However !!! In some cases, the approval and approval of the PPRK in the territorial department of Rostechnadzor is required.

For example clause 235 FNP 533 Order :

On approval of Federal norms and rules in the field of industrial safety "Safety rules for hazardous production facilities where lifting structures are used"


FEDERAL SERVICE FOR ENVIRONMENTAL, TECHNOLOGICAL AND ATOMIC SUPERVISION ORDER

dated November 26, 2020 N 461

235. Lifting and transporting people using a PS, in the passport of which there is no permission to transport people, are allowed in the following cases:
a) during the installation, construction and erection of unique facilities, when other methods of delivering workers to the work area cannot be applied ;

b) during installation and maintenance of stand-alone drilling and other oil and gas production units;
c) at enterprises and docks that carry out work on the construction and repair of ship hulls;
d) on oil and gas platforms installed in the open sea, to change personnel with a rotational method of servicing platforms;
e) when moving personnel to secure and unfasten containers and cargo;
f) when diagnosing and repairing substation steel structures, when the use of other lifting means is impossible;
g) during emergency transportation of people who are unable to move .

PPR for lifting and transporting people using PS should be developed with a prerequisite for meeting the industrial safety requirements set forth in these FNP, and approved by the Federal Service for Environmental, Technological and Nuclear Supervision, except in cases of emergency transportation of people.

 

Full 461 FNP Order: https://www.luckas.ru / order_461 ...

 

How the PPRK will look like

  • Explanatory note;
  • Full tap snapping, both vertical and horizontal
  • Calculation of the danger zone from the cargo moved by the crane and from the fall of cargo from the building;
  • Measures for the safe operation of the crane and the joint operation of machines and mechanisms;
  • Slinging and storage schemes;
  • Technological schemes for lifting and moving loads;
  • Crane foundation project (if required).

If scaffolding or a protective screen is installed in the developed PPR, then in order to obtain the project expertise, it is required to attach a PPR to the scaffolding or a protective screen (with the calculation of loads).

 

COST AND TERMS OF DEVELOPMENT OF PPRK

LUKAS-KRAN has prepared a special offer for its customers! Development of PPRK with the visit of a design engineer to the object from 45,000 rubles! Technological cards from 15,000 rubles!

The final terms of project development are negotiated in advance and range from 5-10 working days (depending on the complexity and type of project).

By concluding an agreement, both parties agree on the timing of the development of the PPRK, an estimate is drawn up and the final price is displayed. If necessary, the company can fulfill an urgent order.

LUKAS-KRAN specialists always take into account the preferences and wishes of the client, making changes in the developed documentation free of charge.

CONTACTS

  • 196626, St. Petersburg,
    p. Shushary, st. Pushkinskaya 25 building 2
  • +7 (812) 309-70-07 (multichannel t / f)
  • +7 (911) 927-52-92 , 927-89-00 , 929-99-97
    (department: mobile rental cranes)
  • Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Up