- Home
- About company
- Our work
- Unloading superstructure LR 1750
- Installation of parts of the Booster attraction
- Conveyor installations and installations
- Installation of a boiler room mast with a 90t truck crane LIEBHERR LTM 1090-4.2
- Installation of the YC-25 hydraulic hammer on the stand
- Work on replacing the hydraulic cylinder
- New truck crane all-terrain vehicle
- Nord Stream-2
- Installation of refrigeration equipment on the roof
- Installation of a concrete plant
- New Year Greetings 2020
- Lifting a truck crane with a crawler crane
- Crawler crane 350t LR 1350
- Launching the boat MOE crane 100t
- Transportation of crawler excavators
- Installation of power transmission line support
- Assembling energy modules
- Lifting the yacht Princess Katrin ashore
- Dismantling and transportation of plant equipment
- Modernization of a mobile harbor crane
- The new MAX TRAILER heavy-duty trawl
- Descent of fire-fighting equipment at the metro station "Prospekt Slavy"
- Dismantling of transport flanges of container handlers
- Installation of window blocks "Lakhta Center"
- Installation of facade elements and glass
- Installation of elements of the deck of the oceanic cable layer
- Installation of the arch of the main entrance of "Lakhta Center"
- Transportation of diesel locomotive TGM-23V
- Installation of a cell tower. LIEBHERR LTM 1130-5.1 working
- Sibur Arena - installation of a tennis court
- Installation of cable-stayed system Volgograd Arena
- The first drive to the base of the new 130t LIEBHERR LTM 1130 truck crane
- New aerial platform Hansin HS450A
- Trawl NOOTEBOOM MCO-PX-142-08V has been added to our fleet
- Transportation of a car wash 4.5 meters wide!
- Lifting a car with a crane
- The work of the truck crane at the stadium "Zenith-Arena"
- Lifting the ship with a truck crane 140 t KRUPP KMK-6140. Video
- We now have a Grünwald Gr-TSt 31 tipper semi-trailer
- We purchased a 70 ton LIEBHERR LTM 1070 truck crane
- Trawl COMETTO ZS3AH / 2550 was purchased and is in operation
- Renewal of our fleet with a 80 ton truck crane GROVE GMK 4080
- Demontage eines Turmkrans
- Launching the yacht
- Installation of temple structures
- Raising the vessel
- Dismantling at the Kirov plant
- Installation of a wind generator
- Installation of the structure on the cathedral
- Installation of equipment on the hotel roof
- Installation of tanks on the Nevsky bridgehead
- Installing the tank on a pedestal
- Turbine loading
- Transportation and installation of a steam locomotive
- Rise of river ships
- Installation of equipment
- Dismantling the sculpture from the Basilica
- Installation of the dome of the church
- Installation of GEMINIS equipment
- Assembling a swing in an amusement park
- Loading of special equipment for further transportation
- Photos of works by our truck cranes
- We are recommended
- Safety regulations
- Choosing a sling for safe lifting work
- Truck crane installation rules
- Signal alarm when the crane is working
- Lifting and moving cargo
- Dangerous area during crane operation
- Strapping and hooking of cargo when working with a truck crane
- Slinging and storage of reinforced concrete structures
- Slinging of parts, equipment and timber
- Slinging and storage of pipes
- Slinging and storage of rolled metal
- Vacancies
- Our work
- Equipment catalog
- Services
- Contacts
- F.A.Q.
- Safety when working with truck cranes
- Useful materials:
- Truck cranes
- Full and partial road closure when performing work with truck cranes
- New Rostechnadzor Rules for the Operation of Lifting Facilities
- Organization of work by cranes in traffic conditions (on the roadway)
- Nuances and features of renting a truck crane
- Video question to Vladimir Putin
- Cargo slinging rules
- New 200 ton LIEBHERR LTM 1200-5.1 truck crane in our fleet!
- Oversized transportation
- Truck cranes
- Sitemap