Nord Stream-2
05.2020
Installation and relocation of winch equipment for drawing the Nord Stream 2 gas transmission pipe using cranes from 35 to 400 tons.
05.2020
Installation and relocation of winch equipment for drawing the Nord Stream 2 gas transmission pipe using cranes from 35 to 400 tons.